Finished Projects

Replacement of water distribution network, Straja
Potable water distribution
Client: STRAJA COMMUNE

Location: Straja Commune, Suceava County

Project value: 165,667.78 RON

Technical indicators: Potable water distribution network, PEHD pipe; total length = 695 m:

    1. PEHD PN10 pipe Dn 160 mm = 154 m
    2. PEHD PN10 pipe Dn 200 mm = 541 m

Establishment of sewerage network, Draxini and Bălușeni
Sewerage and treatment plant
Client: Bălușeni Commune

Location: Draxini and Bălușeni villages, Bălușeni Commune, Botoșani County

Project value: 3,075,306.98 RON

Technical indicators: Gravity and pumping sewerage network: PVC/PEHD; total length = 7,891 m, of which:

    1. Gravity sewerage network: 5,842 m
    2. Pumping sewerage network: 2,049 m
    3. Manholes: 209 pcs
    4. Valve chambers: 3 pcs

Auxiliary works: Subcrossings:

    1. Crossing of communal road with PVC sewer pipe
    2. Crossing of communal road with pressure wastewater pipe PEHD
    3. Crossing of watercourse with PVC sewer pipe

Extension of water supply network, Horia
Water supply
Client: Mitoc Commune

Location: Horia village, Mitoc Commune, Botoșani County

Project value: 494,166.96 RON

Technical indicators: Potable water distribution network, PEHD pipe; total length = 1,690 m, of which:

    1. PEHD PE80 PN6 pipe Dn 75 mm = 1,364 m
    2. PEHD PE80 PN10 pipe Dn 75 mm = 120 m
    3. PEHD PE80 PN10 pipe Dn 90 mm = 45 m
    4. PEHD PE80 PN6 pipe Dn 110 mm = 161 m

PAFS buffer tank, volume 3 m³ = 1 pc.

Technical room equipped with pumping group = 1 pc.

1 aboveground hydrant Dn 80

Rehabilitation of cultural center, Codaești
Cultural center modernization
Client: Codaești Commune

Location: Codăești village, Codăești Commune, Vaslui County

Project value: 1,480,854.12 RON

Technical indicators:

    1. Proposed height regime is P (Minimum eave height – 4.00 m, Maximum ridge height = 6.80 m)
    2. Measured land area S = 352.00 sqm
    3. Built footprint of cultural center = 286.50 sqm
    4. Constructed area of cultural center = 286.50 sqm
    5. Green spaces area = 46.50 sqm
    6. Proposed land coverage ratio (POT) – 81.39%
    7. Proposed floor area ratio (CUT) = 0.81

Extension of Primary School, Răchiți
Extension and modernization
Client: Răchiți Commune

Location: Costești village, Răchiți Commune, Botoșani County

Project value: 4,599,767.15 RON

Technical indicators:

    1. Height regime: P
    2. Proposed built and developed area of school = 957.90 sqm
    3. Proposed built and developed area of kindergarten = 119.20 sqm
    4. Total proposed built and developed area = 1,077.10 sqm
    5. Existing land coverage (POT) = 18.08%
    6. Proposed floor area ratio (CUT) = 0.18
    7. Total useful area = 891.36 sqm
    8. Proposed building volume = 4,159.6 cubic meters

Executed works:

    1. Consolidation of existing building
    2. Demolition of sanitary groups, subsequently built, considering the norms in force and required size, related to the number of children
    3. Extension with sanitary groups, properly dimensioned
    4. Extension with central heating, considering improper placement near a classroom
    5. Extension with assembly hall
    6. Thermal insulation of the building
    7. Restoration of perimeter sidewalks
    8. Restoration of interior and exterior finishes
    9. Replacement of sanitary, electrical and thermal installations
    10. Demolition of kindergarten building and construction of a new school

Youth residential block, Bucecea and Industrial Park
Water and sewerage
Client: Bucecea Town

Location: Bucecea Town, Botoșani Municipality

Project value: 601,969.39 RON

Technical indicators:

    1. The source is constituted by a connection point made on the existing water distribution pipe. The connection point consists of a reinforced concrete chamber, built to protect the installations related to the connection.

Extension of distribution pipe:

    1. From the connection chamber, water will be transported by gravity to consumers in the residential complex via a PEID pipe with diameter De 110 x 6.6 mm PN 10, length L=405 m
    2. Five chambers with the following functions have been provided on the distribution network:
    3. Functions:
      1. Connection chamber - 1 pc;
      2. Valve and drainage device chambers - 1 pc;
      3. Valve chamber equipped with water meter and control devices - 1 pc;
      4. Line valve chambers (sectioning) - 2 pcs.
    4. Three aboveground exterior hydrants DN 80 mm are proposed along the pipe route.

Installation of water treatment station, Rădăuți
Water treatment
Client: Rădăuți Municipality

Location: Rădăuți Municipality, Suceava County

Project value: 31,006,964.77 RON

Technical indicators:

    1. Water treatment station capacity = 23,000 m³/day
    2. Water intake station - 1 pc.
    3. Hydrocyclone and sand separator for suspended solids - 1 pc.
    4. Ozone generator with concentration 3 g O3/Nm3 - 1 pc.
    5. Water filtration installation - 1 pc.
    6. Installation for chemical conditioning of water - 1 pc.
    7. Installation for chlorination of water - 1 pc.
    8. Installation for sludge treatment - 1 pc.
    9. Control and measurement installations - 1 pc.
    10. Electric and automation installations - 1 pc.