EXPANSION OF WATER SUPPLY AND SEWER NETWORK IN BĂLUȘENI COMMUNE, BOTOȘANI COUNTY
Share:
Technical Indicators
Valve chambers on the distribution network = 32 pcs (IA-CA)
Fire hydrants DN80 = 34 pcs
Water pipe
= 6,079 m PEID D90, PE100, PN10, SDR17
= 5,025 m PEID D110, PE100, PN10, SDR17
Connections = 400 pcs, with 1 inlet and 2 outlets D=200/160 mm, with upper adjustment piece Monostrat, H = 1300-1500 mm
Wastewater pumping station SPAU 1 will be a new circular structure made of PHDE, equipped with two pumps with solids separation, operating, with the following characteristics:
internal diameter (D = 1.50 m)
internal basin height (H = 3.35 m)
pumping height (Hp = 10.60 m water column)
Sanitary sewer pipe
= 4,137 m PVC, DN250x7.3mm
= 400 m PVC, DN200x5.9mm
Inspection chambers = 97 pcs, made of prefabricated pipes
Connection chambers = 270 pcs PVC Ø 315mm with composite lid with one inlet and three outlets D=200/160 mm, with upper Monostrat adjustment piece, Class A15. The chamber height is adjustable between 800 and 1250/1800 mm.
Turn your ideas into reality with BAHM CIVIL AND INDUSTRIAL CONSTRUCTIONS!
From strategic planning to detailed execution, we offer customized solutions for durable and impactful projects. We are here to support your vision, step by step.