EXTENSION OF THE WATER SUPPLY AND SEWERAGE NETWORK IN UDEȘTI COMMUNE, SUCEAVA COUNTY

  • Client

    Udești Commune
  • Location

    Udești Commune, Suceava County, Romania
  • Project Status

    Ongoing
  • Project Value

    25,097,408.91 lei
Water and Sewerage
Ongoing

Design and construction services for the investment objective "EXTENSION OF THE WATER SUPPLY AND SEWERAGE NETWORK IN UDEȘTI COMMUNE, SUCEAVA COUNTY"

Technical Specifications

1. Water Supply System Extension:

  • The proposed water supply network extension consists of 32 sections containing PEID pipes with variable diameters between DN75 and DN110, executed over a length of L = 16,288 m.
  • The valve chambers will have the following plan dimensions depending on the valve equipment: 1.4x1.4x1.7 m, or 1.4x1.4x2.0 m, or 1.4x1.4x2.2 m, or 1.4x1.4x2.5 m, or 1.5x1.5x2.0 m. These will be constructed from concrete grade C16/20, with reinforcement made of OB 37 and PC 52. The chamber base slab will be 20 cm thick, walls 15 cm thick, and the slab 10 cm thick.
  • 31 above-ground fire hydrants, diameter 80 mm, will be installed on the distribution network.
  • The designed water supply network includes two types of crossing works: crossings of county roads and crossings of drainage ditches. Their locations are shown in the proposed works plans.
  • The county road crossing will be carried out using horizontal drilling method, complying with STAS 9312-87 standards. The pipe protection crossing the road is proposed as an OL metal pipe DN 250 mm.
  • The drainage ditch crossings will also be done by horizontal drilling using an OL protective pipe with DN 250 mm.
  • Branch chambers will total 720 units, with 1 inlet and 2 outlets, D = 200/160 mm, with Monostrat upper adjustment pieces, height = 1300-1500 mm.

2. Sewerage Network Extension:

  • The designed domestic sewerage network consists of 51 main and secondary collectors made from PVC SN8 pipes, DN 250x7.3 and DN 200x5.9, with a total length of L = 15,983 m.
  • 367 inspection chambers made from prefabricated elements will be installed at maximum distances of 50 m apart, with some sections allowing up to 80 m depending on terrain slope.
  • Wastewater pumping stations (S.P.A.U.) – 8 units.
  • PEID pressure pipeline, PN10, DN63 – DN75, SDR 17, length = 2,935 m.
  • The chambers are made from prefabricated pipes with sockets and spigots, numbering 367 units, consisting of a base, straight elements, eccentric cones, and fitted with frames and trafficable or non-trafficable covers as appropriate, with access via ladders.
  • The designed sewerage network includes three types of crossings: county roads, communal roads, and drainage ditches, as detailed in the proposed works plans.
  • The county road crossing will be executed by horizontal drilling, complying with STAS 9312-87. The protection pipe crossing the road is proposed as an OL metal pipe DN 406 mm.
  • The crossings of communal roads and drainage ditches will also be done by horizontal drilling, with OL protective pipes DN 406 mm.
  • Connection chambers – 240 units – PVC Ø 315 mm with composite covers, with 1 inlet and 3 outlets. These chambers have Monostrat upper adjustment pieces, Class A15. Chamber height is adjustable between 800 and 1250/1800 mm.
  • 10 valve chambers have been provided on the pressure pipeline of the pumping station, for wastewater discharge in case of failures. These chambers will be built from reinforced concrete, class C20/25 for structure and C8/10 for leveling concrete, with plan dimensions 1.2x1.5x2.00 m, executed monolithically.
View our portfolio

Similar projects


Turn your ideas into reality with BAHM CIVIL AND INDUSTRIAL CONSTRUCTIONS!

From strategic planning to detailed execution, we offer customized solutions for durable and impactful projects. We are here to support your vision, step by step.

Request a Quote